Oasis Landscaping was engaged to transform an old original outdoor area into a new, creative space at Balmoral State High School for the students to enjoy.
There were a number of challenges throughout the Balmoral State High School project. These works included a large quantity of trees that had to be placed in concrete surrounds, which effectively limits growth. The area was situated at the main parade ground and surrounded by classrooms, restricting access. Also, it became apparent throughout our course of works that the gas main was leaking.
As a team, we used our extensive network system to source cutting edge methodologies to provide these trees with the best possible chance of survival. To overcome the limited access issue, we used alternative methods, such as pumping the concrete with a boom pump. At Oasis Landscaping we are committed to helping our clients in every way possible. We incorporated the repair of the leaking gas main into our scope of works ensuring that this was no longer an issue for the school.